During the year 2018, the Tolima Governorate reached an increase in the presentation of projects to the Department's Project Bank, which required requesting the universities of the region to present the undergraduate students of the last semester of Engineering and Architecture. For the entity it is a priority to be able to carry out the evaluation, structuring and formulation of the projects in the shortest possible time since it would be the only way to achieve the viability of the projects and thus be able to achieve the strengthening of the entity The Project Bank of the Department of Tolima needed to provide support to all entities that presented their projects, which generated uncertainty since it was not known if they could meet the goals, this is how it is implemented as a strategy that once the evaluation was carried out of the project and evidenced and non-compliance with some of the requirements of the checklist, it was not necessary to make the return to the formulator but work tables were scheduled to remedy the recommendations made in order not to waste time and thus be able to achieve viability Strategy that served to deliver as a result seven viable projects of ten (10) that were under evaluation of the Mining and Energy sector achieving goals in 70% of gasification projects, 30% of projects that were not feasible are Due to the fact that they did not comply with legal procedures such as permission to intervene in roads or due to lack of certifications by local leaders, in this way, institutional, professional and personal goals were achieved at this stage of life.