The Faculty of Mechatronic Engineering in 2017 proposed a project that seeked to provide a solution to the need to complement the practical development of students within the subjects of instrumentation, automation and control. The intention was design and build five plants of the processes that allowed to monitor and control variables, such as: temperature, flow and level of water in a tank, but the time that it requires to manufacture and implementation of those, only reached to finished two plants of five. For this reason and seeking to advance in the process, this project was carried out designing and built other process plant maintaining the same control loops in the pipeline and instruments but reorganizing the distribution of these in the assembly. Additionally, three laboratory guides focused on LabVIEW software and a user manual were made, which allow for a better understanding of the technical and operational aspects of the plant, respectively.