The performance of RCC dams that have been built allow to endorse some constructive processes and to discard others. In all cases, results rely upon the quality of the constructive procedures, which is a direct consequence of the quality control systems carried out during construction. In accordance with the experience acquired in construction of RCC dams, successful behavior is supported on several construction features. Special consideration deserves the control on production, transportation and placement of RCC, treatment of