ImpactU Versión 3.11.2 Última actualización: Interfaz de Usuario: 16/10/2025 Base de Datos: 29/08/2025 Hecho en Colombia
Metodología integral y dinámica aplicada a la programación y control de proyectos Integral and dynamic methodology applied to scheduling and control project
This paper presents the implementation of the integral and dynamic methodology in the scheduling and dynamic control of projects. For this purpose and using the above-mentioned methodology, a model which combines activity networks AON (activity on node), CPM, multimode execution and system dynamics is developed. The model is operationalized by developing two separate networks, i.e., a scheduling network on the one hand and the execution network on the other hand, in order to interact through a control loop. The proposal is validated using activity networks with