Logotipo ImpactU
Autor

Risk Transfer in an Electricity Market

Acceso Abierto

Abstract:

Energy is traded using different products; long-term contracts or electricity forward contracts can assure the future transaction price. However, due to the difficulties in storing electrical energy for long periods and in large amounts, risks must be incorporated when defining contract prices through a Forward Risk Premia (FRP). This study analyzes the transfer of uncertainty from electricity market variables to the FRP in long-term contracts. We evaluate a type of econometric risk with the construction of Autoregressive Distributed Lag contagion models for the FRP using electricity demand, spot price, power generation via different technologies, and the Oceanic Niño Index. As a case study, we consider the Colombian electricity market. Our results show empirical models where the FRP has a short-term response with the following variables: hydropower generation, coal power generation, electricity demand, and Oceanic Niño Index, even though its transaction is reflected one or two years after the occurrence of the event.

Tópico:

Electric Power System Optimization

Citaciones:

Citations: 1
1

Citaciones por año:

Altmétricas:

Paperbuzz Score: 0
0

Información de la Fuente:

SCImago Journal & Country Rank
FuenteMathematics
Cuartil año de publicaciónNo disponible
Volumen9
Issue21
Páginas2661 - 2661
pISSNNo disponible
ISSNNo disponible

Enlaces e Identificadores:

Artículo de revista