The study's objective is to evaluate the feasibility of supplying electricity produced with photovoltaic energy when applied in the plastic forming industry by injection molding. We proposed three coverage scenarios, 100%, 70%, and 50% of the electricity demand of one of the sub-processes of the manufacturing company. Each scenario is evaluated using the area, the economic analysis, and the environmental impacts generated. This project is planned in Funza Cundinamarca, Colombia, on the current land that Grival-Corona of Colcerámica SAS has. A model is obtained in which the kWh installed for the project is costed at USD 13,035. The proposed scenarios represent a cost between USD 631,579 to USD 1,263,158, and the investment recovery ranges between 93 and 100 months depending on the coverage capacity evaluated. Furthermore, the area to be used estimates 40% of available cover in the current manufacturing plant for the most significant evaluated scenario.