In this document, the variation of temperature and radiation in a 100 kW photovoltaic assembly is connected to a 25 kV network through a DC-DC booster converter and a three-phase three-phase voltage source converter (VSC). Maximum power point tracking (MPPT) is implemented in the elevator converter using a Simulink® model that uses the technique of 'Incremental Conductance + Integral Regulator'.
 The switching duty cycle is optimized by an MPPT controller that uses the technique of 'Incremental Conductance + Integral Regulator'. This MPPT system automatically modifies the duty cycle to generate the voltage required to extract the maximum power.