Logotipo ImpactU
Autor

Tools for the Implementation of a SCADA System in a Desalination Process

Acceso Cerrado
ID Minciencias: ART-0001648162-159
Ranking: ART-ART_A2

Abstract:

In this work a system is designed and implemented in SCADA MOVICON 11.5, in which the operation of five seawater desalination lines by reverse osmosis which work in parallel, with four coastal wells and two end-of-line pumps of the permeated water obtained are integrated, synchronized and supervised as a single plant. Each desalination line has its own control system and can operate independently. As a product, synchronization algorithms were obtained that were added to the system through script codes, which guarantee continuous productivity in the desalination process, achieving synchronization between the mentioned sub-processes. Simultaneous operations of starting, washing and stopping that affected the performance of the osmosis lines are avoided. Alarms are generated, reports are created, historical records and trends for the decision making on failures prediction, predictive maintenance and troubleshooting.

Tópico:

Industrial Automation and Control Systems

Citaciones:

Citations: 27
27

Citaciones por año:

Altmétricas:

Paperbuzz Score: 0
0

Información de la Fuente:

SCImago Journal & Country Rank
FuenteIEEE Latin America Transactions
Cuartil año de publicaciónNo disponible
Volumen17
Issue11
Páginas1858 - 1864
pISSNNo disponible
ISSN1548-0992

Enlaces e Identificadores:

Artículo de revista