Logotipo ImpactU
Autor

ANÁLISIS DEL IMPACTO DEL LEAD TIME EN LOS COSTOS TOTALES Y EL NIVEL DE SERVICIO PARA UNA CADENA DE SUMINISTRO CON DIFERENTES ESTRUCTURAS DE PRODUCTOS Y HORIZONTE RODANTE DE PLANIFICACIÓN

Acceso Abierto
ID Minciencias: ART-0001293494-35
Ranking: ART-GC_ART

Abstract:

The main objective of the research is to evaluate the impact of lead time on the system of costs and performance of the service level, for multi-level CSM.The production system is planned and optimized on the rolling horizon, using the GMOP mathematical model, based on the concept of Stroke and Skus.With the results of the simulation, an analysis of variance is carried out, and interaction of the input factors on the response variables of the system.

Tópico:

Business, Education, Mathematics Research

Citaciones:

Citations: 0
0

Citaciones por año:

No hay datos de citaciones disponibles

Altmétricas:

Paperbuzz Score: 0
0

Información de la Fuente:

FuenteProceedings of the 16th LACCEI International Multi-Conference for Engineering, Education, and Technology: “Innovation in Education and Inclusion”
Cuartil año de publicaciónNo disponible
VolumenNo disponible
IssueNo disponible
PáginasNo disponible
pISSNNo disponible
ISSNNo disponible

Enlaces e Identificadores:

Publicaciones editoriales no especializadas