The main objective of this research was to evaluate the performance of the sewage treatment plant (stp) of Santa Fe do Sul in the different climatic seasons. A bathymetric survey of the anaerobic and facultative lagoons was carried out to determine the sludge accumulation profiles and estimate the hydraulic retention time of the units; Three-stage monitoring of the raw sewage and the ponds' effluents for 3-months long each was carried out. The average removal of the biochemical oxygen demand (bod) was 78.6 %, lower than the minimum efficiency allowed by the current Brazilian legislation; the amount of fecal coliforms (fc) and the settleable solids volume exceeded the permitted values by the regulation. The stp needs maintenance on the anaerobic lagoon and a post-treatment system to guarantee additional bod, fc and solids removal on the final effluent.