Introduction. This project analyzes the situation in a Company, Dugotex S. A., specifically in the cleaning area, which has 40 % of unproductive time periods, caused by the lack of standardized procedures for the operations previous to the assembly of every production order, thus causing failures to the programming schedules, delays in the deliveries and low production in the plant. Objective. Introduce a proposal to reduce unproductive time periods